Player and Volunteer Registration for the 2024 Season is NOW OPEN!

Bakken Park
4064 Vilas Rd

Cottage Grove, WI

Phase 1

These drone pics show the Phase 1 of our construction – excavating and grading, and the concrete base (over which the rubberized field surface will be installed in the Spring). We will be installing the fencing around the field, including the backstop, by the end of...